Company
QatarEnergy is a state-owned public corporation established byEmiri Decree No. 10 in 1974. It is responsible for all phases
of the oiland gas industry in the State of Qatar.The principal activities of QatarEnergy, its subsidiaries and jointventures are
the exploration, production, local and international saleof crude oil,natural gas and gas liquids, refined products,
syntheticfuels,petrochemicals, fuel additives, fertilizers, liquefied natural gas(LNG), steel and aluminium.Qatar Energy’s
strategy of conducting hydrocarbon exploration anddevelopment is through Exploration and Production Sharing
Agreements(EPSA) and Development and Production Sharing Agreements (DPSA)concluded with major international oil
and gas companies.The operations and activities of QatarEnergy and its affiliates areconducted atvarious onshore
locations, including Doha, Dukhan and the Mesaieed andRas Laffan Industrial Cities, as well as offshore areas, including
HalulIsland, offshore production stations, drilling platforms and the NorthField.Thriving on a spirit of enterprise, each of our
joint ventures isunderpinned by transparency, innovation and high standards of qualityand service. At QatarEnergy, we are
committed to one thing aboveall: Excellence.
Department
OPERATED OFFSHORE OIL FIELD DEVELOPMENT
Primary purpose of job
As a member of interdisciplinary reservoir study team, participate in field reservoir managemen. Participation includes
planning, coordinating, and controlling the collection, analysis, and evaluation of petrophysical data for well and reservoir
studies. Through these efforts, the candidate will generate appropriate development plans and provide petrophysical
support for QatarEnergy operated Idd El Shargi Oil Field.
Must have strong teamwork skills and experience working in a multicultural and multidiscipline environment. Must be able to
communicate effectively with peers, less experienced staff, field staff, and management.
reservoir/field development studies for model building and updating.
development plans ensuring petrophysical uncertainty ranges are captured and understood.
voidage management) and long-term (field development and asset value optimization) activities.
fluid properties.
working with contract companies to develop and execute a sound program.
Experience & Skills
advanced logging technology.
working in multicultural integrated asset team environment.
knowledge of various carbonate depositional systems.
histograms) techniques.
Software Knowledge/ Experience
Decision Making Authority
consequences therein; work requires only periodic monitoring by Assistant Manager/Head.
placement based on reservoir fluid characterization and distribution via a near real-time monitoring of wireline/LWD
operations.
to the company. In many instances, the success or failure of an implemented plan will not become apparent until many
years into the project, after the entire capital expenditure has been expended.
Context / Special Features / Challenges
risk/reward.
need the mental rigour to deal with frequent disruptions outside working hours and to make optimal operational decisions
regardless of the nature or timing of the disruption.
and produce high Quality “fit-for-purpose” deficiency free work; through the Quality of the work, establish a high degree of
trust between the different disciplines of the team.
Education
desirable.